DJM was brought into this project when it was discovered that the entire rectory rubble foundation required extensive masonry restoration. Helical ties were used to tie the wythes together in order to withstand the hydrostatic pressure of the foundation grouting. All deep voids were backpointed and repointed, and some rubble areas were completely rebuilt.