Phase 1 – Structural enhancement of the roof was a challenging project as limited access required the maneuvering of steel members by hand through narrow openings prior to placement within the roof space. Temporary facilities were set up in advance to carry out the work in a safe manner.
Phase 2 – Interior renovation. The mandate was to keep the Church functioning during the renovations and DJM worked closely with Church personnel to ensure that the daily activities of the Church were not compromised. At the end of each week an area was prepared for Sunday services. All furnishings including lighting systems and the organ were removed and a complete scaffold system was erected to facilitate the work. The project consisted of extending the altar to allow for multi-functional use, new wood patterned floors replaced carpet and painting of the walls and ceilings enhanced a previously dull and dark space. Faux finishes were used throughout to replicate stone and marble. A new lighting system introduced with multiple effects that could be set to suit the occasion. A large stained glass window behind the altar was restored as well.
* D.J. McRae Contracting was awarded Project of the Year by the Toronto Construction Association for this project.
Copyright © 1972 - 2022 D.J. McRae Contractors Ltd.
Webflow website by North Designs
info@djmcrae.ca
101-100 Sunrise Ave
Toronto, Ontario
M4A 1B3 Canada
(416) 532-3078